Low-voltage network upgrade
Lower losses and a more stable grid for an industrial park.
Location
Kermanshah
Year (Iranian calendar)
1402
Replacing worn conductors, balancing phase loads and adding protective equipment reduced network losses and unplanned outages.
Want a similar project? Talk to our specialists.
Get a free consultationMore projects
Industrial
200 kW rooftop solar plant
Grid-tied system cutting electricity costs for a manufacturing site.