Industrial
200 kW rooftop solar plant
Grid-tied system cutting electricity costs for a manufacturing site.
Full design, supply and construction (EPC) in Kermanshah province.
This ground-mounted plant uses about 1,800 panels and three-phase grid-tied inverters. Our team handled the site study, structural design and coordination with the local utility.
Production is monitored online under a scheduled maintenance contract.
Want a similar project? Talk to our specialists.
Get a free consultationGrid-tied system cutting electricity costs for a manufacturing site.
Lower losses and a more stable grid for an industrial park.